The project consisted of a 60,000 square foot, four-story office building connected to a 60,000 square foot lab. The structure includes steel framed construction, load-bearing tilt-up panels, and a deep pier foundation system. Construction was completed in 2013.
Larson Engineering Inc. provided the structural engineering services for this ground-up development.